Forecast Period | 2025-2029 |
Market Size (2023) | USD 3.10 Billion |
Market Size (2029) | USD 4.46 Billion |
CAGR (2024-2029) | 6.10% |
Fastest Growing Segment | BFSI |
Largest Market | New South Wales |
Market Overview
Australia Data Center Construction
Market was valued at USD 3.10 Billion in 2023 and is expected to
reach USD 4.46 Billion by 2029 with a CAGR of 6.10% during the forecast period.
The Data Center Construction market refers to the sector involved in the
design, development, and construction of facilities that house computing,
storage, and networking equipment essential for the operation of data centers.
These facilities are critical infrastructures that support a wide range of
digital services, from cloud computing and data storage to large-scale
processing tasks.
The construction of a data center involves several key
components, including site selection, architectural design, electrical systems,
cooling solutions, and physical security measures. The market encompasses
various stakeholders such as construction firms, architects, engineers, and
equipment suppliers who collaborate to build highly efficient, secure, and
scalable data centers.
Growth in the Data Center Construction market is
driven by the increasing demand for data processing and storage capabilities
due to the rapid expansion of cloud services, IoT devices, big data analytics,
and the digital transformation of businesses. Additionally, factors like
advancements in data center technologies, the need for energy efficiency, and
rising data security concerns influence the market. As organizations continue
to generate and manage vast amounts of data, the demand for new and upgraded data
center facilities is expected to remain strong, making this market a critical
component of the global digital economy.
Key Market Drivers
Growing Demand for Cloud Services and Digital
Transformation
One of the primary drivers of the Data Center
Construction market in Australia is the escalating demand for cloud services
and the broader digital transformation of businesses. Over recent years,
companies across various sectors have increasingly adopted cloud computing
solutions to enhance operational efficiency, scalability, and
cost-effectiveness. This shift towards cloud-based infrastructure has led to a
significant increase in data storage and processing requirements, necessitating
the construction of new data centers to meet these needs.
Australia’s digital economy is rapidly expanding, with
businesses leveraging cloud services for everything from software as a service
(SaaS) to infrastructure as a service (IaaS). As more companies move away from
traditional on-premises IT infrastructure, the need for reliable, scalable, and
secure data centers becomes more critical. This trend is further accelerated by
the growing adoption of digital technologies, including big data analytics,
artificial intelligence (AI), and the Internet of Things (IoT). These
technologies generate vast amounts of data that require advanced data storage
and processing capabilities, fueling the demand for state-of-the-art data
centers.
The Australia government’s push towards
digitalization, including initiatives like the Digital Transformation Strategy,
has encouraged organizations to invest in modern IT infrastructure. Public
sector entities are also increasingly adopting cloud services, further
contributing to the demand for data centers. The ongoing trend of digital
transformation in Australia is expected to continue driving the need for new
and upgraded data center facilities, making it a key driver of the Data Center
Construction market.
- As of 2024, over 80% of federal agencies migrated mission-critical workloads to cloud or hybrid-cloud models.
Expansion of Global Hyperscale Data Center Operators
The expansion of global hyperscale data center
operators into the Australia market is another significant driver of Data
Center Construction. Hyperscale data centers are large facilities that house
vast numbers of servers and support large-scale cloud computing operations.
These data centers are typically built by major technology companies such as
Amazon Web Services (AWS), Microsoft, Google, and Alibaba, which require
extensive infrastructure to support their cloud services and global operations.
Australia has become an attractive destination for
hyperscale data center operators due to several factors, including its stable
political environment, advanced telecommunications infrastructure, and
proximity to key Asia-Pacific markets. The entry and expansion of these global
players into Australia have led to a surge in data center construction
activities. These companies are building massive data centers to serve both
local and regional markets, creating a ripple effect throughout the
construction industry.
The increasing presence of hyperscale operators in
Australia is driving investment in related infrastructure, such as power
supply, cooling systems, and network connectivity. This, in turn, is fostering
the growth of the broader data center ecosystem, including construction firms,
equipment suppliers, and service providers. The expansion of hyperscale data
centers is expected to continue as demand for cloud services and digital
content in the Asia-Pacific region grows, making it a key driver of the Data Center
Construction market in Australia.
- Microsoft is expanding its Australian Azure Region with 9 new data centers (announced October 2023) to support national digital transformation goals.
- According to internal estimates published by Arista Networks in 2024, Australia's cloud data traffic is expected to grow by over 50% annually.
Rising Focus on Data Sovereignty and Localized Data
Storage
Data sovereignty and the need for localized data
storage have become crucial factors driving the Data Center Construction market
in Australia. Data sovereignty refers to the legal and regulatory requirements
that dictate where data can be stored and processed, often requiring that data
generated within a country’s borders remain within those borders. In Australia,
concerns about data privacy and security have led to increased emphasis on data
sovereignty, particularly in sectors such as finance, healthcare, and
government.
The Australia government has implemented stringent
data protection regulations, such as the Australian Privacy Principles (APPs)
and the Notifiable Data Breaches (NDB) scheme, which mandate how organizations
handle personal data. These regulations, coupled with the growing awareness of
data privacy issues among consumers and businesses, have driven the demand for
localized data storage solutions. Organizations are increasingly seeking to
store their data within Australia borders to ensure compliance with these
regulations and to mitigate risks associated with cross-border data transfers.
This focus on data sovereignty has spurred the
construction of data centers within Australia, as companies look to build or
lease facilities that guarantee local data storage. Additionally, multinational
companies operating in Australia are also constructing data centers to ensure
that they can comply with local regulations while serving their Australian
customers. The emphasis on data sovereignty is expected to continue driving the
demand for localized data center construction, as organizations prioritize compliance
and security in their data management strategies.
Advancements in Data Center Technologies and
Sustainability Initiatives
Advancements in data center technologies and the
growing emphasis on sustainability are significant drivers of the Data Center
Construction market in Australia. As the demand for data processing and storage
continues to rise, there is a parallel need for data centers that are more
efficient, resilient, and environmentally sustainable. Technological
innovations in areas such as energy efficiency, cooling systems, and automation
are transforming the way data centers are designed and constructed.
One of the key technological trends driving the market
is the adoption of energy-efficient solutions. Data centers are notorious for
their high energy consumption, and as the industry grows, so does its
environmental impact. To address this, companies are increasingly investing in
green data center technologies, such as advanced cooling systems that reduce
energy usage, renewable energy sources, and energy-efficient server designs.
These innovations not only reduce operational costs but also help companies
meet their sustainability goals, which is becoming increasingly important to
both businesses and consumers.
In addition to energy efficiency, advancements in
automation and artificial intelligence are enhancing the operational efficiency
of data centers. Automated systems can optimize resource allocation, monitor
equipment performance, and predict maintenance needs, reducing downtime and
improving overall efficiency. These technological advancements are influencing
the design and construction of new data centers, as companies seek to build
facilities that are not only scalable but also equipped to leverage the latest
innovations.
Sustainability initiatives are also playing a crucial
role in driving data center construction in Australia. Companies are under
increasing pressure to reduce their carbon footprint and operate more
sustainably. This has led to the development of data centers that are designed
with sustainability in mind, incorporating features such as solar panels,
rainwater harvesting, and energy-efficient building materials. The growing
focus on sustainability is expected to continue shaping the Data Center
Construction market, as companies strive to balance their need for data
processing power with their environmental responsibilities.

Download Free Sample Report
Key Market Challenges
High Energy Consumption and Sustainability Concerns
One of the significant
challenges facing the Data Center Construction market in Australia is the high
energy consumption associated with data centers and the growing concerns about
sustainability. Data centers are among the most energy-intensive facilities,
consuming vast amounts of electricity to power servers, storage devices, and
cooling systems. As the demand for data processing and storage continues to
rise, so does the energy requirement, leading to increased operational costs
and a significant environmental impact.
Australia, like many other
countries, is grappling with the need to balance economic growth with
environmental sustainability. The construction of new data centers contributes
to this challenge, as these facilities can strain local energy grids and increase
greenhouse gas emissions. The Australian government and regulatory bodies are
placing increasing emphasis on reducing carbon emissions and promoting the use
of renewable energy sources. However, integrating these sustainable practices
into data center construction can be complex and costly.
Building energy-efficient
data centers often requires significant upfront investment in advanced cooling
technologies, renewable energy infrastructure, and energy-efficient hardware.
While these investments can lead to long-term savings and environmental
benefits, the initial costs can be prohibitive for many developers and
operators. Additionally, retrofitting existing data centers to improve energy
efficiency can be challenging, particularly in older facilities that were not
designed with sustainability in mind.
The availability of
renewable energy sources in certain regions of Australia may be limited, making
it difficult for data center operators to achieve their sustainability goals.
This is particularly challenging in remote areas where access to clean energy
is less feasible. As a result, operators may face difficulties in securing the
necessary power supply to support large-scale data center operations while
meeting sustainability targets.
The increasing focus on
sustainability also adds regulatory pressure, with governments and industry
bodies imposing stricter environmental standards on data center construction
and operation. Compliance with these regulations can be complex and may require
substantial changes to construction practices, further adding to the cost and
complexity of building new data centers. As energy consumption and
sustainability concerns continue to rise, addressing these challenges will be
crucial for the long-term growth and viability of the Data Center Construction
market in Australia.
Skilled Labor Shortage and Rising Construction Costs
Another critical challenge
facing the Data Center Construction market in Australia is the shortage of
skilled labor and the rising construction costs. The construction of data
centers requires a highly specialized workforce, including architects, engineers,
electricians, and IT professionals with expertise in designing and building
complex infrastructure. However, Australia is currently experiencing a shortage
of skilled labor across various sectors, including construction, which is
exacerbating the challenges in the data center industry.
The shortage of skilled
labor is driven by several factors, including an aging workforce, declining
apprenticeship rates, and competition from other construction projects,
particularly in urban areas where infrastructure development is booming. The
COVID-19 pandemic further disrupted the labor market, leading to delays in
training programs and reduced availability of skilled workers. As a result,
data center construction projects are facing delays and increased costs due to
the limited availability of qualified personnel.
In addition to the labor
shortage, rising construction costs are another significant challenge. The cost
of building materials, including steel, concrete, and specialized equipment,
has been on the rise due to global supply chain disruptions, inflation, and
increased demand. These rising costs are putting pressure on data center
developers, who must balance the need for high-quality, resilient
infrastructure with budget constraints.
The combination of skilled
labor shortages and rising construction costs is leading to delays in project
timelines and increased financial risk for developers. In some cases, data
center projects may be postponed or scaled back due to the inability to secure
the necessary workforce or materials. This not only affects the overall growth
of the Data Center Construction market but also impacts the ability of
businesses to access the data processing and storage capabilities they need.
To mitigate these
challenges, the industry is exploring various strategies, including investment
in training programs to develop a new generation of skilled workers, the
adoption of modular construction techniques to reduce labor requirements, and
the use of alternative materials to lower costs. However, addressing these
issues will require coordinated efforts from industry stakeholders, educational
institutions, and government bodies to ensure a sustainable and skilled
workforce capable of meeting the demands of the growing data center market in
Australia.
Key Market Trends
Increased Adoption of Modular Data Center Construction
One of the most prominent trends in the Australia Data Center Construction market is the increased adoption of modular
construction techniques. Modular data centers are pre-fabricated units that can
be quickly assembled on-site, offering a scalable and flexible solution to meet
the growing demand for data processing and storage. This approach allows for
faster deployment, reduced construction time, and lower overall costs compared
to traditional data center construction methods.
Modular data centers are particularly appealing in a
market where speed to market is crucial, especially as demand for digital
services continues to rise. In Australia, where construction timelines can be
impacted by factors such as skilled labor shortages and regulatory approvals,
the modular approach offers a viable alternative. These units can be
manufactured off-site in a controlled environment, ensuring consistent quality
and reducing the risk of delays due to weather or on-site challenges.
Modular data centers provide flexibility in terms of
scalability. As data needs evolve, additional modules can be added to existing
facilities, allowing businesses to expand their data center capacity without
significant disruptions. This trend is especially relevant in Australia, where
companies are increasingly looking for agile and cost-effective solutions to
meet their IT infrastructure needs.
The adoption of modular data centers also aligns with
the growing emphasis on sustainability. These units are often designed with
energy efficiency in mind, incorporating advanced cooling systems,
energy-efficient hardware, and even renewable energy sources. The reduced
construction waste and lower energy consumption associated with modular data
centers contribute to their appeal in a market that is increasingly focused on
sustainability.
Rise of Edge Data Centers
The rise of edge computing is driving a significant
trend toward the construction of edge data centers across Australia. Edge data
centers are smaller facilities located closer to end-users and devices,
designed to process data locally rather than relying on centralized, hyperscale
data centers. This trend is being fueled by the growing adoption of
technologies such as the Internet of Things (IoT), 5G networks, and real-time
data processing applications, which require low-latency and high-bandwidth connections.
In Australia, the demand for edge data centers is
growing as businesses and service providers seek to improve the performance and
reliability of their digital services. By processing data closer to the source,
edge data centers can reduce latency, enhance user experience, and improve the
efficiency of data-intensive applications. This is particularly important in
regions where network connectivity may be limited or where there is a need for
real-time data processing, such as in autonomous vehicles, smart cities, and
industrial IoT applications.
The construction of edge data centers is also being
driven by the need for data sovereignty and localized data storage. In response
to regulatory requirements and concerns about data privacy, businesses are
increasingly looking to store and process data within Australian borders. Edge
data centers provide a solution by enabling localized data processing, ensuring
compliance with data sovereignty laws while improving the security and
reliability of data services.
As the demand for edge computing continues to grow,
the trend toward constructing edge data centers is expected to accelerate. This
trend will likely lead to a more distributed data center infrastructure in
Australia, with a mix of large hyperscale facilities and smaller, localized
edge data centers working together to meet the evolving needs of businesses and
consumers.
Segmental Insights
End User Insights
The IT & Telecommunication held the largest market share
in 2023. the proliferation of cloud
computing is a major driver. As businesses and consumers increasingly rely on
cloud-based services for storage, software, and processing power, the demand
for robust data center infrastructure has surged. Companies like Amazon Web
Services (AWS), Microsoft Azure, and Google Cloud are expanding their
footprints in Australia, necessitating the construction of new, high-capacity
data centers to meet the growing demand for their services. These hyperscale
data centers, essential for supporting massive amounts of data and
computational power, are predominantly built by and for the IT &
Telecommunication sector.
The advent of 5G technology is
transforming the telecommunication landscape, requiring extensive data
processing and low-latency infrastructure that only well-equipped data centers
can provide. As telecom companies upgrade their networks to support 5G, they
are investing heavily in data centers to handle the increased data flow and
ensure seamless connectivity.
The sector’s focus on innovation and
digital transformation drives the need for cutting-edge data centers. Companies
are increasingly utilizing big data analytics, artificial intelligence, and
machine learning, all of which require significant data processing and storage
capabilities. The IT & Telecommunication sector, being at the forefront of
these technological advancements, naturally drives a higher demand for
state-of-the-art data center facilities.
Data sovereignty concerns are
particularly pertinent in the IT & Telecommunication sector, as companies
must ensure that data is stored and processed within Australian borders to
comply with regulatory requirements. This need further fuels the construction
of localized data centers, reinforcing the sector’s dominance in the market.

Download Free Sample Report
Regional Insights
New South Wales (NSW) held the largest
market share in 2023. NSW, particularly
Sydney, serves as Australia's primary economic and financial hub. The city is
home to numerous multinational corporations, financial institutions, and
technology companies that drive substantial demand for data center services.
The concentration of these businesses requires robust data infrastructure to
support their operations, fueling the need for extensive data center
construction.
Sydney boasts a well-developed
infrastructure that supports data center operations. The city has a strong
telecommunications network, with high-speed fiber-optic connectivity and
reliable power supply. This advanced infrastructure is crucial for data centers,
which require high bandwidth and stable power to function efficiently. The
availability of these resources makes NSW an attractive location for data
center operators.
The NSW region offers a skilled
workforce with expertise in IT, engineering, and construction. This talent pool
is essential for designing, building, and maintaining data centers. The
presence of leading educational institutions and training programs in NSW
contributes to a steady supply of qualified professionals, which supports the
growth of the data center industry.
NSW's geographic location provides
strategic advantages for data center operators. Sydney's position as a major
gateway to the Asia-Pacific region enhances its appeal for international data
center operators looking to serve global and regional markets. The city's
connectivity and its role as a regional hub make it an ideal location for data
centers aiming to support cross-border data exchange and cloud services.
The NSW government has been proactive in
supporting infrastructure development, including data centers. Policies and
incentives aimed at promoting technology and innovation further drive
investment in data center construction. As a result, the NSW region continues
to attract significant investment and expansion, reinforcing its dominance in
the Australia data center market.
Recent Developments
- In December, 2024, Turner Construction, under the ACS Group, has significantly expanded its data center project portfolio, securing over €10 billion in contracts globally. While specific Australian projects weren't detailed, this expansion indicates potential involvement in Australia's growing data center market.
- October , 2024, Fortis Construction has been ranked among the top data center contractors nationally, securing the #7 spot in Engineering News-Record and #5 in Building Design + Construction rankings. This recognition underscores their expertise, which could be leveraged in Australian data center projects.
- February, 2025,Schneider Electric highlighted the impact of AI on data center energy consumption, noting that Australia's data center market is projected to nearly double to USD 40 billion over the next four years due to AI-driven demand.
- February, 2025, Cisco and NVIDIA announced a partnership to accelerate AI adoption in enterprises by creating a unified architecture for AI-ready data center networks, enhancing flexibility and choice in AI data center investments.
- In June 2024, The Biden Administration
has advanced its efforts to upgrade and expand the aging U.S. transmission infrastructure
by launching the Federal-State Modern Grid Deployment Initiative, which will
connect 21 states. This initiative, described as "unprecedented,"
aims to accelerate improvements to the power distribution network, which has
been hindered by political and technological challenges affecting the growth of
clean energy capacity. The initiative responds to recent reports on the rising
power demand from large-scale operations such as data centers, artificial
intelligence (AI), and the anticipated expansion of hydrogen fuel production.
- In March 2024, Sidewalk Infrastructure
Partners (SIP), the Alphabet spinout specializing in innovative solutions for
complex infrastructure challenges in areas such as power, broadband, and waste
management. Verrus represents a new approach to flexible data center energy
management. It leverages advanced microgrid technology, integrating high-power
batteries with sophisticated software to optimize and allocate energy for
specific tasks and applications. This solution addresses power management
issues associated with modern computing demands, including peak periods of
cloud computing and large-scale projects like AI training. Verrus is designed
to manage these demands by scheduling and distributing energy-intensive tasks
across periods of lower overall demand.
- In June 2024, Macquarie Data Centres has
initiated the construction of its AI and Cloud data center, IC3 Super West, in
Sydney, Australia. Concurrently, the company’s cloud services division has
launched a hybrid cloud solution, Macquarie Flex, developed in partnership with
Dell and Azure. FDC Construction (FDC) has been appointed as the primary
contractor for the IC3 Super West project, which will be the third and largest
data center within the Macquarie Park Data Centre Campus located in Sydney’s
North Zone. Upon completion, the IC3 Super West data center will elevate the
campus' total IT load capacity to 63MW, with operations expected to commence
once all power requirements are fully secured.
Key Market Players
- AECOM
- Fortis Construction Inc.
- Turner Construction Company
- DPR Construction
- Schneider Electric SE
- Cisco Systems Inc.
- Arista Networks, Inc.
- SAS Institute Inc.
|
By Tier Type
|
By Data Center Size
|
By Infrastructure
|
By End User
|
By Region
|
- Tier 1 & 2
- Tier 3 & Tier 4
|
- Small
- Medium
- Large
- Massive
- Mega
|
- Cooling
Infrastructure
- Power Infrastructure
- Others
|
- IT &
Telecommunication
- BFSI
- Government
- Healthcare
- Others
|
- New South Wales
- Northern Territory
- Queensland
- South Australia
- Tasmania
- Victoria &
Western Australia
|
Report Scope:
In this report, the Australia Data
Center Construction Market has been segmented into the following categories, in addition to the
industry trends which have also been detailed below:
- Australia
Data
Center Construction Market, By Tier Type:
o Tier 1 & 2
o Tier 3 & Tier 4
- Australia
Data Center Construction Market, By Data Center Size:
o Small
o Medium
o Large
o Massive
o Mega
- Australia
Data Center Construction Market, By Infrastructure:
o Cooling Infrastructure
o Power Infrastructure
o Others
- Australia
Data Center Construction Market, By End
User:
o IT & Telecommunication
o BFSI
o Government
o Healthcare
o Others
- Australia
Data Center Construction Market, By Region:
o New South Wales
o Northern Territory
o Queensland
o South Australia
o Tasmania
o Victoria & Western Australia
Competitive Landscape
Company Profiles: Detailed analysis of the major companies
present in the Australia Data Center Construction Market.
Available Customizations:
Australia Data Center Construction Market report
with the given market data, TechSci Research offers customizations according
to a company's specific needs. The following customization options are
available for the report:
Company Information
- Detailed analysis and
profiling of additional market players (up to five).
Australia Data Center Construction Market is an upcoming
report to be released soon. If you wish an early delivery of this report or
want to confirm the date of release, please contact us at sales@techsciresearch.com